This ensures that we can provide students with the best possible opportunities and facilities in the most appropriate locations. Selling land releases extra funds for other government facilities and initiatives, for example, to expand and improve existing schools and build new schools where they are needed most.
Due to changing demographics, a former school site can become surplus to education requirements. This means that there is sufficient capacity delivered at other facilities in the local area to cater for the projected enrolment demand in the area and future population growth. We carefully review our demand projections which are based on a rigorous analysis of demographic data. We will retain a site where our projections indicate that a site will be required to meet future demand for student enrolments.
We also work with the local councils, communities, the Victorian Planning Authority and other stakeholders, to monitor and plan for government education provision.
This way we can ensure all Victorian students have access to high-quality education and that current and future demand for schools is properly planned.
Types of surplus sites
We own many different types of properties – they may be former schools that have closed, relocated or merged, former campuses or parts of existing school sites, former administration buildings, unused teacher houses, vacant land or plantation sites that were previously governed by a school but are no longer required.
When is land declared surplus?
Former school land may be declared surplus for several reasons:
- When the population changes in an area, or there are operational reasons, a school may choose to shut down a campus or decide to close completely.
- A school may relocate to a new location to access better community resources or facilities.
- Local schools may choose to merge to ensure that students are part of a sustainable and thriving school.
When we no longer require a piece of land, we declare it surplus and dispose of the site. The land may be acquired by other government agencies or the local council, or it may proceed to public sale for purchase by private individuals or businesses (depending on the zoning). Under government policy, other government agencies and local council have a first right of refusal to purchase such land and local councils are able to purchase surplus education land for a reduced price subject to the land being used for a public or community purpose.
Maintaining vacant surplus land can be onerous, as they can become targets of vandalism and antisocial behaviour. Disposing of the sites means that they can be repurposed for productive use, rather than remaining vacant.
Surplus school sites
Sebastopol Primary School – John Earnshaw Oval
- Year Oval Closed: 2010
- On 12 March 2010, the Sebastopol Primary School Council passed a motion that it does not require John Earnshaw Oval.
- The oval is not adjacent to the existing school site but is separated by several house blocks.
Windermere Primary School
- Year School Closed: 2014
- Windermere Primary School closed due to declining student numbers. The school was de-staffed at the end of 2012 with no students enrolled for 2013.
- Full community consultation was undertaken in 2013 and the School Council requested to close the school in March 2013.
Yarragon Primary School (old site)
- Yarragon Primary School relocated from Rollo Street to a larger site in Loch Street on 19 November 2012.
- As the new site can accommodate future growth, the old site is not required. Buildings on site were demolished in November 2016.
Athlone Primary School
- Year School Closed: 2013
- Athlone Primary School closed in 2013 due to declining student numbers.
- The School Council led the communication consultation process and initiated the decision to formally close the school.
Benalla College (oval)
- On 20 September 2012, the Benalla College Principal and School Council wrote to the Department of Education and Training requesting the land where the school’s oval was located be declared surplus as it had not been used for more than 20 years.
Peranbin Pimary College – Tatong Campus
- Year Campus Closed: 2011
- In 2005, the campus became unstaffed due to no enrolments. The campus stayed open to allow access to a number of community interest groups in the Tatong area.
- In May 2010, the school council resolved that the campus should close as soon as possible.
- Following a meeting between the school council and a small community group, the campus was declared surplus in 2011.
Charlton College – Donald Street Campus
- Year Campus Closed: 2014
- Charlton College – Donald Street Campus was the site of the North Central TAFE Cluster, which operated for 20 years to provide a technology-based curriculum to seven cluster schools.
- In 2011, the cluster successfully applied for funding to build a Trade Training Centre, which was completed in September 2014 on the main Charlton College site at Davies Street.
- The Donald Street site has been deemed surplus to requirements.
Kyabram P-12 College – Dawes Campus
- Year Campus Closed: 2014
- Kyabram Secondary College merged with Haslem Street Primary School and Dawes Road Primary School from 1 January 2009 to become Kyabram P-12 College.
- As part of the reorganisation, all three school councils ratified that the new school be located on the sites of the former Kyabram Secondary College and Haslem Primary School, which share a common border.
- Between 2012 and 2014 the merged College trialled a year 9 program at the Dawes Road Campus but this was discontinued, resulting in the site becoming surplus to the school’s requirements.
- Buildings on site were demolished in November 2016.
Echuca South Primary School
- Year School Closed: 2017
- Echuca South Primary School merged with Echuca West Primary School to form Echuca South West Primary School.
- The site is not required for future education provision.
Echuca West Primary School
- Year School Closed: 2017
- Echuca South Primary School merged with Echuca West Primary School to form Echuca South West Primary School.
- The site is not required for future education provision.
Echuca College (Formally Echuca High School)
- Year School Closed: 2009
- This is a vacant site, a portion of this site is required for the Echuca Moama bridge project
Welton Primary School
- Year School Closed: 2017
- Welton Primary School closed due to declining student numbers.
- In 2017 the school year commenced with nine students. By term 3 2017 the enrolments had decreased to six students. These remaining students transitioned to other local schools.
- The Welton Primary School Council met on 27 July 2017 and resolved that the school would close at the end of term 3 2017.
Modella Primary School (part site)
- Year School Closed: 1993
- Modella Primary School closed at the end of 1993 and most of the site was sold in 1994. The remainder of the school site is surplus to educational requirements.
Cressy Primary School
- Year School Closed: 2010
- Cressy Primary School closed due to declining student numbers.
Lavers Hill K-12 College – Barongarook Campus
- Year Campus Closed: 2009
- From 2010, the site was used by a community college, which exited in 2016. The community college conducted an extensive assessment in conjunction with community groups with a view to potentially re-establishing itself at the site. However, the development of a business case for re-purposing the site was not progressed.
- As the current primary school network is forecast to have sufficient capacity to meet demand until at least 2036, the site was considered surplus.
Lavers Hill K-12 College – Gellibrand Campus
- Year Campus Closed: 2008
- Lavers Hill K-12 College – Gellibrand Campus was the site of the former Gellibrand Primary School.
- In 2008, the school determined it no longer required the site for education purposes.
- Buildings on site were demolished in June 2017.
Swan Marsh Primary School
- Year School Closed: 2011
- Swan Marsh Primary School closed due to declining student numbers.
- In Term 1, 2011, the parents of the final three students enrolled transferred their students to other schools. The School Council then made the decision to close the school.
Colac Secondary College – Murray Street Campus
- Year Campus Closed: 2009
- Following the merger of Colac High School with Colac College in 2008, the Murray Street Site become the second campus of Colac Secondary College.
- The site was declared surplus as part of Stage 2 of the Colac Regeneration Project.
- Buildings on site were demolished in November 2016 with exception of the heritage-listed building.
Quambatook Group School
- Year Campus Closed: 2019
- Quambatook Group School closed due to declining student numbers. The school was de-staffed mid-year 2017 with no students enrolled for 2019.
- Full community consultation was undertaken in 2018 and the School Council requested to close the school in October 2018.
Maryborough Education Centre – Peel Street Reserve
- Year Campus Closed: 2007
- A full sfull-sizeicial grass over has been constructed on the main school site. As a result, the Peel Street Reserve is no longer used by the school.
Bannockburn Primary School
- Year Campus Closed: 2007
- This campus was closed due to the relocation of the Bannockburn Primary School to a new site in Milton Street, Bannockburn. The new school incorporates all years from Prep to Year 12.
Bendigo South East 7-10 Secondary College – Golden Square Campus
- Year Campus Closed: 2008
- This campus was closed due to the previous Golden Square Secondary College being merged with Flora Hill Secondary College to create the new Bendigo South East Secondary College.
- The Golden Square site comprises two parcels of land; the oval and the remainder of the site.
- The site is not required for future education provision.
- The gymnasium has been leased.
Lightning Reef – Nolan Street Campus
- Year Campus Closed: 2012
- On 1 January 2011, Bendigo North Primary School (located at Nolan Street) and Comet Hill Primary School (located at Holmes Road, Bendigo) merged to form Lightning Reef Primary School. The decision to merge and be located on the Holmes Road site was ratified by all three school councils.
- As part of a $13.25 million Regeneration Project, the buildings on the Holmes Road site were replaced, and from December 2012 all students and staff were located on the Holmes Road site.
- Included as part of the project is an integrated early learning centre, which provides long day care, kindergarten, occasional care, and maternal and child health services.
- This centre commenced operation on 7 January 2013. As a result of the merger and building project, the school site and a vacant block of land opposite the school became surplus to education requirements.
- The proposed merger and the development of the new school were the subject of considerable discussion between the two school councils and their respective communities.
Golden Square Primary School
- Year School Closed: 2015
- Golden Square Primary School merged with Maple Street Primary School in 2009 due to falling enrolments. The merged school initially operated on both sites. Then, in 2013 the school relocated to the Laurel Street site to allow a new school to be rebuilt on the Maple Street site. This process was completed in 2015, when the Laurel Street site was declared surplus.
- Extensive community consultation was a part of this process.
Drummartin Primary School
- Year School Closed: 2015
- Drummartin Primary School closed in 2015 due to declining student numbers. On 3 March 2015 the school council met and resolved that the school should close at the end of that year.
- The 2015 enrolment was six students, two of which were in year 6. The school’s enrolments had increasingly declined from 15 in 2012. Community consultation indicated that there was no prospect for significant enrolment growth in the near future.
Athol Road Primary School – East Campus (formerly Southvale Primary School)
- Year Campus Closed: 2011
- As part of the broader Springvale/Dandenong Primary School Regeneration Project, Southvale Primary School and Springvale South Primary School merged to become Athol Road Primary School in August 2009.
- The merged school operated at both school sites as campus until Stage 1 of the new school was ready for the start of the 2012 school year.
Chandler Park Primary School – Maralinga campus
- Year Campus Closed: 2015
- As part of the broader Springvale/Dandenong Primary School Regeneration Project, Maralinga Primary School and Chandler Primary School merged to form Chandler Park Primary School in 2010. Initially the school operated from both sites, which are 700 metres apart.
- Due to declining enrolments at the merged school, the Chandler Park Primary School Council resolved in a meeting in December 2014 that the Maralinga campus should close.
- Buildings on site were demolished in June 2017.
- Due to the location and access issues, the site is not suitable for future education provision. A new site for a planned primary school in Keysborough South has been acquired, that will respond to growth in the area.
Oberon High School
- Former High School located to a new location in Armstrong Creek from the 2021 school year
- Lease of library building for Scouts Victoria.
- Several buildings has been demolished plus a new Gym refurbishment is expected in
Rosewall Primary School
- Year School Closed: 2008
- Rosewall Primary School merged with Corio Primary School on the Corio Primary School site from the 2009 school year.
- The site is not required for future education provision.
Windermere Primary School
- Year School Closed: 2014
- Windermere Primary School closed due to declining student numbers. The school was de-staffed at the end of 2012 with no students enrolled for 2013.
- Full community consultation was undertaken in 2013 and the School Council requested to close the school in March 2013.
Laharum Primary School – Vacant Site
- Year Campus Closed: 2019
- In 2009, The Laharum Primary School moved a motion of support to relocate from its existing location at 1574 Northern Grampians Road, Laharum to a site adjacent to Cameron Oval Recreation Reserve.
- In 2010, a 1,377 hectare vacant site at 1455 Northern Grampians Road, Laharum was acquired as part of the then Rural School Replacement Program in the Buiding Futures process.
- However, due to the investment in and upgrades to facilities at the old school site, the school council of Laharum Primary School resolved that the vacant site at 1455 Northern Grampians Road should be declared surplus.
- The vacant site is not required for future education provision.
Meadows Primary School – Campmeadows campus
- Year Campus Closed: 2008
- In 2009, Meadowbank Primary School and Campmeadows Primary School merged due to falling enrolments.
- A state-of-the-art new school was built on the Meadowbank site, which opened in March 2011. As a result of the new facilities, the Campmeadows campus was declared surplus.
- The site is not required for future education provision.
Upfield Primary School
- Year School Closed: 2010
- As part of the Victorian Government’s Broadmeadows Regeneration Project, Upfield Primary School merged with Dallas Primary School to form the dual campus Dallas Brooks Community Primary School at the start of the 2011 school year.
- Dallas Brooks Community Primary School continued to use the former Upfield Primary School site until the end of 2014.
- Buildings on site were demolished in November 2016.
Boronia K-12 College – Mount View Campus
- Year Campus Closed: 2014
- In December 2012, the former Boronia Primary School and Boronia Heights Secondary College merged to form Boronia K-12 College.
- The former Boronia Heights Secondary College site operated as the Mount View Campus. The site was originally built for a secondary provision with a large technical component but, over time, the school moved to being a secondary college with an emphasis on academic subjects.
- The former Boronia Primary School site on Albert Avenue was redeveloped and completed at the end of the 2014 school year, providing the school with new purpose-built accommodation for all students from Prep to Year 12. This allowed the school to close the Mount View campus at the end of the 2014 school year.
Morwell Primary School
- Year School Closed: 2016
- As a result of the Morwell Regeneration Project, Morwell Primary School, Commercial Road Primary School and Tobruk Street Primary School merged to create the new Morwell Central Primary School.
- A new state of the art facility opened on a site on McDonald Street in January 2017, leaving the three former school sites vacant.
- The Commercial Road site was retained for future education provision.
- The Morwell Primary School and Tobruk Street Primary School sites are not required to be retained for future education provision. The Tobruk Street site was sold to the Department of Health and Human Services in August 2017.
Boort District P-12 School – King Street campus
- Year Campus Closed: 2012
- On 1 January 2011, Boort Primary School merged with Boort Secondary College to form Boort P-12 College. The name of the school was later changed to Boort District P-12 School.
- As part of a regeneration project, the buildings on the secondary college site were replaced with new buildings, which were completed at the end of 2012.
- This resulted in all staff and students relocating to one site, leaving the King Street Campus (site of the former Boort Primary School) vacant.
- Buildings on site were demolished in June 2017.
Kyneton Primary School
- Following a community survey and consultation, Kyneton Primary School relocated to a new site at Edgecombe Street.
- Kyneton Primary School will start operating at the new site at the start of the 2018 school year, meaning the old school site will cease to be required at the end of the 2017 school year. The old site is surplus to education requirements.
- Currently under a public EOI.
Croydon South Primary School
- Year School Closed: 2008
- Croydon South Primary School merged with Tinternvale Primary School on the Tinternvale site at the end of the 2008 school year.
- The merger resulted in the site of the former Croydon South Primary School being surplus to education requirements. The site is not required for future education provision.
- In connection with the $19.5 million Maroondah Education Plan, a land swap (the Melba Land Exchange) with the Maroondah City Council has been proposed, whereby the Department of Education and Training acquires land adjacent to Melba College from the Council for use by the School and also to allow Kilsyth Basketball Club to establish a major basketball facility, with the Department acting as landlord.
- In exchange, the Maroondah City Council will acquire part of this site plus part of the Parkwood Secondary College site for community use.
- The Melba Land Exchange was approved by the Victorian Government Land Monitor.
Ballerrtt Mooroop College – Glenroy campus
- Year Campus Closed: 2012
- In its 2011 report, Indigenous Education in Victorian Government Schools, the Victorian Auditor General’s Office recommended the Koorie Pathway Schools be reviewed as a matter of priority. The review found that the schools were unsustainable and not meeting their core objectives.
- Upon consideration of the review and community feedback, the Victorian Government decided in October 2012 to close the four Koorie Pathway Schools, including Ballerrt Moroop College, effective from 21 December 2012. Buildings on site were demolished in November 2016.
- The new Glenroy Specialist School, catering for students with physical or multiple disabilities or complex health needs, opened from new premises at the site at the beginning of the 2013 school year. A local kindergarten, Will Rook Glenroy Preschool, is also located on the site.
- The Department of Education and Training has entered into a 30-month lease with Merri-bek City Council regarding providing access to a spirit tree and ceremonial ground at the site. The Council has entered into a corresponding sub-lease to the Wurundjeri Council for these areas.
Merbein P-10 College – Jenner Street campus
- Year Campus Closed: 2012
- Merbein Primary School (located at Jenner Street), Merbein South Primary School (located on the Sturt Highway), Merbein West Primary School (located at Paschendale Street) and Merbein Secondary College (located at Commercial Street) merged to create Merbein P-12 on 1 January 2010.
- The new school was consolidated and rebuilt at the site of Merbein Secondary School on Commercial Street, with all staff and students accommodated on the site as of October 2012.
- The decision to merge and be located on the Commercial Street site was ratified at meetings of all four school councils. The other three sites became surplus to educational requirements.
Merbein P-10 College – Paschendale Avenue campus
- Year Campus Closed: 2012
- Merbein Primary School (located at Jenner Street), Merbein South Primary School (located on the Sturt Highway), Merbein West Primary School (located at Paschendale Street) and Merbein Secondary College (located at Commercial Street) merged to create Merbein P-12 on 1 January 2010.
- The new school was consolidated and rebuilt at the site of Merbein Secondary School on Commercial Street, with all staff and students accommodated on the site as of October 2012.
- The decision to merge and be located on the Commercial Street site was ratified at meetings of all four school councils. The other three sites became surplus to educational requirements.
Ouyen P-12 College – Hunt Street campus
- Year Campus Closed: 2008
- Ouyen Primary School, located at Hunt Street, Ouyen merged with Ouyen Secondary College, located at Fuller Street, Ouyen from 1 January 2009 to form Ouyen P-12 College.
- The decision to merge and be located on the secondary school site at Fuller Street was ratified at meetings of both school councils. The proposed merger and development of the new school was the subject of significant discussions between the school councils and their respective school communities.
- A $9.5 million regeneration project refurbished or replaced many of the buildings on the Fuller Street site. These works were complete by the end of the 2013 school year allowing students and staff to be accommodated at the Fuller Street site from the start of the 2014 school year.
- The former primary school site at Hunt Street became surplus to education requirements.
Sunnycliffs Primary School
- Year School Closed: 2017
- Sunnycliffs Primary School closed due to declining student numbers with only 7 enrolments expected in 2018.
- Extensive community consultation was undertaken and the School Council requested to close the school in October 2017.
Seymour College – Delatite Road Campus
- Year Campus Closed: 2013
- Seymour College was created in 2010 through a merger of Seymour Technical High School (located at Loco Street), Seymour Primary School (located at Grant Street), Seymour East Primary School (located at Delatite Road) and Seymour Special School (located at Tallarook Street).
- An $11.9 million building works program allowed the school to construct new purpose-built accommodation for primary and special school students on the Loco Street site. These works were completed in June 2013 and allowed for all students and staff to relocate from Delatite Road to Loco Street. The Delatite Road Campus site then became surplus. Buildings on site were demolished in June 2017.
- Seymour College continues to operate from three campuses, located at Loco Street, Tallarook Street and Grant Street. An extensive consultation process was undertaken as part of the merger/regeneration discussions involving a range of stakeholders including students, staff, parents, school councils and the local community.
Yarrawonga College P-12 – Tom Street Campus
- Year School Closed: 2017
- Yarrawonga College P-12 Tom Street Campus closed due to relocation 2017.
Katunga South Primary School
- Year School Closed: 2021
- Site closed due to decrease in students with only 5 in in 2021.
Mount Waverly Primary School (part site)
- A former laneway not required by the school was declared surplus.
Barkers Creek Primary School
- Year School Closed: 1993
- Barkers Creek Primary School closed due to declining enrolments. 14 students attended the school in 1993.
Castlemaine Primary School (part)
- The Castlemaine Primary School has two parcels of land, one which is vacant and unused by the school because it is separated from the main site with school buildings by the busy Pyrenees Highway.
- There are four other primary schools in Castlemaine and all have capacity for further growth.
- The school council of Castlemaine Primary School resolved that the vacant land, which is only 0.808 hectare in area, should be declared surplus.
Caramut Primary School
- Year School Closed: 2004
- Caramut Primary School merged with Mortlake College at the end of the 2004 school year.
- The closure of the school site was approved by the community.
Highlands Primary School
- Year School Closed: 2016
- Highlands Primary School closed due to declining enrolments. Thirteen students attended the school in 2016.
Glenorchy Primary School
- Year School Closed: 2010
- Glenorchy Primary School closed at the end of 2010 with eight students enrolled that year.
Beaufort Primary School (old site)
- Beaufort Primary School relocated to a newly built school in March 2014 on the Beaufort Secondary College site.
- The primary school is now co-located with the secondary school and an early learning centre.
Dunkeld Consolidated School (formally Glenthompson Primary School)
- Year School Closed: 2013
- Glenthompson Primary School merged to become a campus of Dunkeld Consolidated School in 1998.
- The Glenthompson campus was de-staffed in March 2012 due to low enrolment numbers.
Tallangatta Valley Primary School
- Year School Closed: 2017
- Tallangatta Valley Primary School Council met during July 2016 and resolved that the school should close from January 2017.
- Three students were enrolled in 2016 and the expected 2017 enrolment was two students.
Carrajung South Primary School
- Year School Closed: 2012
- Carrajung South Primary School was de-staffed at the end of 2006 by a resolution of the School Council due to declining enrolments.
- The proposed closure was the subject of formal community consultation at a community meeting held in October 2011, at which there was unanimous community support for the closure of the school.
Meerlieu Primary School
- Year School Closed: 2021
- With declining enrolments and a projection of only two students for 2015 the school council of Meerlieu PS resolved that the school should be de-staffed from 31 December 2014.
Sale and District Special School – Desailly Street Campus & Raymond Street Campus
- Year Campuses Closed: 2017
- The Desailly Street Campus shares the same site as the Raymond Street Campus but they are separated by an historic arrangement.
- A new site for the Sale and District Special School was acquired in 2013 and the staff and students from both campuses transferred to the new site in 2018.
- As a result the old site of the campuses became surplus to education requirements.
Kaniva College (part site)
- Kaniva Secondary College and Kaniva Consolidated School merged to become Kaniva College, operating on both existing school sites as of the start of the 2002 school year.
- As part of this restructure, a part of one of the school sites was identified as surplus to the school's requirements by the school.
Lalor East Primary School (part site)
- Lalor East Primary School relinquished an area of its site, which is located under high voltage power lines, as surplus to its requirements.
Wodonga South Primary School (old site – part)
- Wodonga South Primary School relocated from its old site on Jarrah Street to form part of the Southern Rise Education Centre on Cartwright Street.
- The Southern Rise Education centre was formed in 2011 when Wodonga South Primary School and two local preschools relocated from existing sites.
- The previous site has been declared surplus to education requirements.
Yarra Hills Secondary College – Cambridge Campus (remainder of the site, excluding the oval)
- Year Campus Closed: 2013
- Yarra Hills Secondary College was formerly named Pembroke Secondary College and merged with both Mooroolbark Secondary College and Mount Evelyn Secondary College, resulting in a three-campus structure.
- Following a $20.8 million modernisation project in 2012 and 2013, the Cambridge campus of the School became surplus.
- The site is not required to be retained for future education provision.
- The oval on the site has been leased to the Yarra Ranges Shire Council for 20 years. The remaining portion of the site is surplus to education requirements.
Warburton Primary School (part site)
- A parcel of land on the site of Warburton Primary School was declared surplus in 2000.
- This parcel of land houses the Cerini Centre. The Cerini Centre was contracted for sale in 2003 but the contract of sale did not proceed due to subdivision related complications (as the land is currently part of the larger school site) and was ultimately rescinded. The site is currently unoccupied.
Yellingbo Primary School
- Year School Closed: 2016
- Yellingbo Primary School closed at the start of 2016 with two students enrolled that year.
Hopetoun Primary School
- Year School Closed: 2013
- In November 2013, the Hopetoun school council advised they sought to co-locate on the secondary campus site due to the proximity of traffic.
- Approval was given for the school reorganisation.
Woomelang Group School
- Year School Closed: 2018
- Due to declining enrolments, the Woomelang Group School Council resolved that the school would close at the end of Term 4, 2018.
- Demographic forecasting indicated there is an ongoing trend of low enrolments, with limited need for ongoing education provision at the site.
To find out what sites are being prepared for sale, see Victorian Government Land Sales.